Sign In | Join Free | My wneducation.com
China Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd logo
Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd
New start, Leap forward, Hand in hand, Build our dreams
Active Member

9 Years

Home > Decorative Powder Coating >

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd
Contact Now

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

  • 1
  • 2

Brand Name : Greentech

Model Number : 3524

Certification : SGS

Place of Origin : Tianjin,China

MOQ : 500kg

Price : $2.6-5.8/kg

Supply Ability : 1000 tons per month

Packaging Details : 20kg/carton

Raw Material : Epoxy Polyester Hybird resin

Color : Ral color

usage : indoor

Gel time : 250±50

Application Method : Electrostatic spray

Gloss : high/Low/Matt

Contact Now

electrostatic epoxy polyester resin powder coating

Feature:

  1. Excellent adhesion, flexibility, impact resistance, high hardness. Good flow property, vividness, fullness, saturation, beautiful decoration.
  2. To improve the reaction rate of the material, to enhance the effect of seculars reflection, light saturation capacity. Reflection effect, decorative effect is improved.
  3. The protection of pigment is much better.
  4. Giving coating more functional elements according to the different requirement, such as waterproof and rust-proof.
  5. Make the powder coating easy to reach grooves, corner.
  6. Powder rate is high, the coating with high efficiency, spraying area is large, the cost is lower than the paint coating.
  7. Environmental protection, excluding volatile matter, no smell of paint, do not contain heavy metals and polybrominated biphenyl (certification testing by SGS), in line with the international general standards, without any toxic and side effects

Item Test standard and method Test
Appearance Color uniform, loose without blocking, dry coating liquidity 120—140mm visual
color As customer required Chromatic meter
Adhesion GB/T9286-1998 ISO2409 0 class
Impact resistance GB/T1732-1993 ISO6272 50kg.cm
flexibility GB/6742-1986 ISO1519 3mm
Cupping test GB/T9753-1993 ISO1520 8mm
Pencil hardness GB/T6739-1996 ASTM/D3363 1H-2H
Salt spray testing GB/T1771-1991 ISO7253 > 500hour
Heat resistance 150℃/24 hours(white) <0.5
Humid and hot resistance GB/T1740-1979 ISO6270 >1000hous

Application areas: air conditioning, refrigerator, microwave ovens, cooking hoods electric kettles and other household appliances shell


Product Tags:

powder coating powder

      

exterior powder coating

      
Buy cheap Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant product

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)